• Bayou water conveyance capacity: Determine the bayou water conveyance capacity for current state of the topographic parameters and its watershed. District to interface with Harris County Flood Control District for related data for capacity evaluation.
  • Backslope drainpipe outfalls: Tabulate the repair status of all the backslope drainpipe outfalls. Coordinate with trail projects team to determine the priority of addressing the repair of backslope drainpipe outfalls. Complete repairs of all outfalls as needed.
  • Desilting and bayou bank slop restoration project: Proceed with further phases of the bayou desilting and slope restoration project.
  • MS4 Issue: Ongoing working on MS4 issue with TCEQ.